P Floor Protect: hardening protector for concrete

What is P Floor Protect?

P Floor Protect is a ready-to-use impregnating agent in an aqueous solution based on sodium silicates, intended for the protection and surface hardening of concrete. It is used on floors and concrete structures, with the application cycle selected based on absorption, the condition of the substrate, and operating conditions.

How it works on concrete

The treatment penetrates the substrate and forms insoluble deposits in the capillary pores, helping to reduce permeability while allowing the concrete to breathe. Its effectiveness depends on the substrate's absorption capacity, preparation, and condition.

The treatment is intended to improve surface abrasion resistance, provide a dust-proofing effect, and help reduce efflorescence. The final appearance and slip resistance must be verified by testing on the actual surface under the intended conditions of use.

Applications

  • New or existing concrete industrial floors.
  • Parking lots, sidewalks, and airport pavements.
  • Slabs, floors, floor screeds, and foundations.
  • Tanks, basins, manholes, and structures intended for water and wastewater treatment, subject to technical verification of the system.

For contact with aggressive substances, hydrocarbons, or de-icing salts, the substance, concentration, temperature, and duration of exposure must be checked with the technical service. The treatment should not be considered a universal guarantee against all chemical attack, penetration, or rising damp.

Indicative coverage: how many square meters can be treated with one liter?

Coverage varies depending on the substrate's absorption. Perform a preliminary test and treat until saturation. Before calculating the required quantity, confirm whether the expected coverage refers to the entire application cycle.

Application Indicative coverage
External floors dust-spread with quartz 6–7 m²/l
Foundations and retaining walls 3 m²/l
Internal floors dust-spread with quartz 4.5–5.5 m²/l
Concrete floor screeds, floors, slabs, and foundations 3.5–4.5 m²/l
Tanks and basins in contact with water or other substances, if suitable 5–7 m²/l
Dust-proofing and carbonation treatment 5–6 m²/l
Consolidation and freeze-thaw treatment 4–5 m²/l
Above-ground treatment for waterproofing purposes, subject to cycle verification 3–4 m²/l
Chemical attack and negative pressure, subject to design verification 2–3 m²/l

These coverage rates alone do not confirm suitability for use. For waterproofing, counter-pressure, and wastewater containment, the application cycle must be verified based on the conditions of the structure.

Substrate preparation

Remove dirt, dust, grease, oils, paint, efflorescence, moss, algae, and lichens that hinder penetration. Choose the cleaning method based on the type of contamination: washing with water, hot water, or steam for oils and grease, or brushing and dust removal in the absence of adherent dirt.

After cutting the contraction joints, carefully remove all cutting dust before treatment to prevent it from mixing with the product.

How to apply

Before starting work on site, confirm the application cycle based on the substrate and environmental conditions. The following times are indicative and must be verified for the actual application.

  1. Check maturity: for hardened concrete, a curing period of at least 28 days is recommended. Effectiveness may be reduced on fresh concrete; do not apply if bleeding is present, i.e., water is seeping to the surface.
  2. Prepare the substrate's moisture: for hardened concrete, wet the surface as specified in the cycle, then allow the surface to dry, approximately 6–24 hours.
  3. Agitate the product and apply the first coat until saturation using a brush, roller, or low-pressure sprayer.
  4. Allow the first coat to dry before applying the second coat in an orthogonal direction.
  5. Remove excess: the cycle requires cleaning with a pressure washer after approximately 12 hours. Hardened excess may cause color changes that can only be removed by abrasion.
  6. Protect from traffic: wait at least 12–24 hours after completing the application, depending on the temperature and the conditions of the cycle.

On vertical walls, start from the bottom. For retaining walls, the indicative time before backfilling is 12 hours, to be confirmed based on actual conditions and the prescribed cycle.

Subsequent paints and resins

Wait approximately 15–21 days before painting or applying resins. The mere passage of time does not replace the verification of compatibility, cleanliness, moisture, and the adhesion of the subsequent cycle.

Technical data and project documentation

To specify P Floor Protect in a specification, request the latest technical documentation from Pigment Al for the product supplied. Density, VOC content, reaction to fire, chemical resistance, and protective performance must be confirmed before use in a design.

For applications requiring performance in accordance with EN 1504-2, check the applicable documentation and its compliance with the proposed system. Suitability for basins, aggressive substances, and negative pressure must be assessed on a case-by-case basis.

Packaging and storage

Standard sizes: 25 kg containers, 220 kg drums, and 1,100 kg tanks. Confirm packaging and availability during the quoting stage.

Store in closed containers, protected from frost and direct sunlight, at a temperature between 5 and 25 °C. Consult the safety documentation for the product supplied for handling and precautions.

Frequently asked questions

Is P Floor Protect ready to use?

Yes, it is a ready-to-use impregnating agent. Do not add water or other components without specific technical instructions for the product supplied.

Can it be applied to fresh concrete?

Application to fresh concrete may have reduced effectiveness and must not be done when bleeding is present. For hardened concrete, a curing period of at least 28 days is recommended.

What is the coverage?

It depends on absorption and application. Indicative coverage is 6–7 m²/l on external floors dust-spread with quartz and 4.5–5.5 m²/l on internal floors. Perform a test and confirm the cycle before ordering.

Is it suitable for all chemicals?

It should not be assumed to be resistant to any substance. For basins and aggressive environments, request an assessment of the specific conditions and test documentation.

When can a resin be applied?

The indicative waiting period is 15–21 days, with verification of compatibility and substrate conditions before the subsequent treatment.

Request information and a quote

Contact Pigment Al indicating the surface area in m², the type and age of the concrete, the condition of the substrate, exposure conditions, and any subsequent paints or resins. For basins and containment structures, also specify the substances present and operating conditions so that the treatment can be verified before supply.